Drill Results for Dungarvon Tungsten Project

The drill results for the Peaked Mountain target for the Dungarvon tungsten-molybdenum-tin project in New Brunswick. The completely completed six holes at Peaked Mountain, for a total of 837 meters of drilling.

Mark Fields, President and CEO of Geodex stated: “Our drill program was designed to locate the origin of the numerous tungsten-molybdenum high grade boulders ."

"Which may have been sourced from a potential greisen-quartz vein system at Dungarvon. The drilling has limited the potential size of a deposit with the character of the boulders which were our exploration focus."
 

Tungsten Manufacturer & Supplier: Chinatungsten Online - http://www.chinatungsten.com
Tel.: 86 592 5129696; Fax: 86 592 5129797
Email: sales@chinatungsten.com
Tungsten Picture Center: http://picture.chinatungsten.com
Tungsten Video Center: http://v.chinatungsten.com
Tungsten News & Tungsten Prices, 3G Version: http://3g.chinatungsten.com

 

WeChat