Science And Technology:By 2015 More Than 80% Chip to Achieve Localization
- Details
- Category: Tungsten & Sapphire Growth Furnace News
- Published on Friday, 14 March 2014 13:49
Science and Technology released the " Plan" put forward in 2015 , more than 80 % of the chip to achieve localization , to achieve large-scale MOCVD equipment , localization of key raw materials , LED product cost reduction as low as 2011 's 1/5; LED lighting products in the general lighting market share reached 30% , the annual saving 100 billion degrees, the annual saving 35 million tons of standard coal ; industry reached 500 billion yuan . In order to ensure the realization of "planning" to set goals , to promote the application of the relevant departments will jointly issued guidance on the implementation of the semiconductor lighting applications central financial subsidy policy .
Insiders pointed out that the current LED chips accounted for nearly 60% of the estimated cost of lighting , light fixtures chip price will be able to drive costs down by nearly 50% ; plus packaging technology to enhance the popularity of low-cost and efficient drive circuit , lighting costs can be reduced now 30 % -40 %, so replace 40W incandescent LED bulb price drop to 20-30 million , street decline slightly smaller , but it can be reduced to a thousand or so mainstream price , to help accelerate the LED lighting in the civilian market penetration.
Tungsten Manufacturer & Supplier: Chinatungsten Online - http://www.chinatungsten.com
Tel.: 86 592 5129696; Fax: 86 592 5129797
Email: sales@chinatungsten.com
Tungsten & Molybdenum Information Bank: http://i.chinatungsten.com
Tungsten News & Tungsten Prices, 3G Version: http://3g.chinatungsten.com
Molybdenum News & Molybdenum Price: http://news.molybdenum.com.cn