Drill Results for Dungarvon Tungsten Project

The drill results for the Peaked Mountain target for the Dungarvon tungsten-molybdenum-tin project in New Brunswick. The completely completed six holes at Peaked Mountain, for a total of 837 meters of drilling.

Mark Fields, President and CEO of Geodex stated: “Our drill program was designed to locate the origin of the numerous tungsten-molybdenum high grade boulders ."

"Which may have been sourced from a potential greisen-quartz vein system at Dungarvon. The drilling has limited the potential size of a deposit with the character of the boulders which were our exploration focus."
 

Tungsten Manufacturer & Supplier: Chinatungsten Online - http://www.chinatungsten.com
Tel.: 86 592 5129696; Fax: 86 592 5129797
Email: sales@chinatungsten.com
Tungsten Picture Center: http://picture.chinatungsten.com
Tungsten Video Center: http://v.chinatungsten.com
Tungsten News & Tungsten Prices, 3G Version: http://3g.chinatungsten.com

 

WeChat

Tungsten Metal

Tungsten Metal Price

Tungsten Alloy

Tungsten Alloy Price

Tungsten Carbide

Tungsten Carbide Price

Tungsten Powder

Tungsten Powder Price

Tungsten Copper

Tungsten Copper Price

Tungsten Oxide

Tungsten Oxide Price