Overhaul Tungsten Points’ Ablation in Distributor- II
- Details
- Category: Tungsten Information
- Published on Wednesday, 15 July 2015 16:35
2. Overhaul tungsten points’ ablation on riveting loose or bracket set screw loose.
Opening the distributor lid, inspecting the situation of tungsten rivet and points bracket set screw loose condition, then pulling the two tungsten points back and forth. And then removing tungsten points, and re-riveting to make it no loose, or changing tungsten points directly when the tungsten points are loose.
Tightening the tungsten points’ bracket set screw when they are loose.
3. Overhaul the skew and offset situation of contact surface.
Opening the distributor lid, the first thing is to inspect the offset and skew situation.
Adjusting the gasket of active tungsten contact arm when the contact surface offset.
Using pliers for twisting tungsten points frame to correct them when the contact surface of tungsten points has skew or excursion.
Tungsten Metals Manufacturer & Supplier: Chinatungsten Online - http://www.tungsten.com.cn
Tel.: 86 592 5129696; Fax: 86 592 5129797
Email: sales@chinatungsten.com
Tungsten & Molybdenum Information Bank: http://i.chinatungsten.com
Tungsten News & Tungsten Prices, 3G Version: http://3g.chinatungsten.com
Molybdenum News & Molybdenum Price: http://news.molybdenum.com.cn